Big Changes Part 2 Driveway continues
Time for a driveway update. The electricity wires for the garage that were accidentally ripped out of the ground yesterday, have been repaired. The first load of limestone was just poured. Dan says we’re supposed to get two more loads of limestone. I’m so excited!!! No more muddy driveway!!
What good is a post without pictures?
Here’s the first load of limestone. A HUGE truck backed down our driveway. Not sure how the guy did it so easily!
And here’s Ron, our head contractor, using the Bobcat to spread out the limestone.
More updates to follow!